Tumakuru Smart City Limted - Progress Review

Construction of Toilet Block at NCC Campus
Status : Completed
Image : Images     Images
BeforeAfter
6KW centralized Off-Grid Solar Power Plant with LED based Solar street lighting system
Status : Completed
Image : Images     Images
BeforeAfter
Providing Toilet Block at PU College
Status : Completed
Image : Images     Images
BeforeAfter
Pedestrian Environment Improvement & Public Place making at Govt. PU College Precinct
Status : Completed
Image : Images     Images
BeforeAfter
Clearance of 05 nalas of Amanikere
Status : Completed
Image : Images     Images
BeforeAfter
Installation of Sanitary Napkin Dispenser & Incinerator (at Empress High school PU college)
Status : Completed
Image : Images     Images
BeforeAfter
50 KW-off-Grid Solar Photo Voltaic (SPV) System at GOVT.PU College
Status : Completed
Image : Images     Images
BeforeAfter
Smart Lounges - Furniture part
Status : Completed
Image : Images     Images
BeforeAfter
Plantation around Amanikere lake
Status : Completed
Image : Images     Images
BeforeAfter
Smart Parking at M.G Road Conservencies - Civil Part
Status : Completed
Image : Images     Images
BeforeAfter
Smart Parking at M.G Road Conservancies - IT Part
Status : Completed
Image : Images     Images
BeforeAfter
Upparahalli Flyover Under Space Development
Status : Completed
Image : Images     Images
BeforeAfter
Plantation on Medians
Status : Completed
Image : Images     Images
BeforeAfter
Interior works for Integrated City Management Command & Control Centre in Town Hall Building in Tumakuru
Status : Completed
Image : Images     Images
BeforeAfter
Supply of UAV systems (Drone Procuement)
Status : Completed
Image : Images     Images
BeforeAfter
Sports facility Center at PU College
Status : Completed
Image : Images     Images
BeforeAfter
Digital Library Solution
Status : Completed
Image : Images     Images
BeforeAfter
Skill Development Centre for NCC Cadets,Firing Simulator for NCC Building - IT Part
Status : Completed
Image : Images     Images
BeforeAfter
Selection of Agency for Operation and Maintenance of Smart Lounge at Amanikere - IT Part
Status : Completed
Image : Images     Images
BeforeAfter
Supply, installation of Litter bins, roller containers and sign board
Status : Completed
Image : Images     Images
BeforeAfter
Integrated City Management Control Centre (ICMCC)
Status : Completed
Image : Images     Images
BeforeAfter
Establishement and Operation of Teacher resource center and student resource center in Tumakuru City
Status : Completed
Image : Images     Images
BeforeAfter
Selection of Agency for Establishment of Smart Classrooms at different Govt. SchoolsColleges of Tumakuru.
Status : Completed
Image : Images     Images
BeforeAfter
Signage & Legibility- Digital Display Boards (at 3 locations)
Status : Completed
Image : Images     Images
BeforeAfter
Selection of Agency for establishment of digital classrooms, ICT lab and language labs at Govt. College and schools of Tumakuru. (Call-2)
Status : Completed
Image : Images     Images
BeforeAfter
Supply, Installation of Furniture & Electrical work of DiNC for PHC -Tumakuru.
Status : Completed
Image : Images     Images
BeforeAfter
Additional Class rooms Block at PU College
Status : Completed
Image : Images     Images
BeforeAfter
Development of Banyan Tree Boulevard
Status : Completed
Image : Images     Images
BeforeAfter
Rejuvenation & Up gradation of Ring Road
Status : Completed
Image : Images     Images
BeforeAfter
Development of Field Marshal Cariappa road as Smart road
Status : Completed
Image : Images     Images
BeforeAfter
Development of Women Theme Park at Uparahalli
Status : Completed
Image : Images     Images
BeforeAfter
Intelligent Transport System
Status : Completed
Image : Images     Images
BeforeAfter
Digital Nerve Centre
Status : Completed
Image : Images     Images
BeforeAfter
Locked House Monitoring System (LHMS)
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - TCC Premises
Status : Completed
Image : Images     Images
BeforeAfter
Dredging, Desilting, Lining, Restoration & Reclamation Works of Upstream Feeder Channels
Status : Completed
Image : Images     Images
BeforeAfter
Construction of Smart e-Toilets
Status : Completed
Image : Images     Images
BeforeAfter
Intermediate Para transit Stands (Auto Stands) 2 No's
Status : Completed
Image : Images     Images
BeforeAfter
Tree Plantation Under HT Line
Status : Completed
Image : Images     Images
BeforeAfter
Redevelopment of Siddaganga Bus Shelter
Status : Completed
Image : Images     Images
BeforeAfter
Smart Park- Tumakuru University Park- (Civil)
Status : Completed
Image : Images     Images
BeforeAfter
Contribution towards improvement of Water Supply Scheme (under AMRUT)
Status : Completed
Image : Images     Images
BeforeAfter
Development of Nursery for afforestation and green buffer zones at Amanikere
Status : Completed
Image : Images     Images
BeforeAfter
Smart Lounges & Information Kiosks at Amanikare Lake basin
Status : Completed
Image : Images     Images
BeforeAfter
Intermediate Para Transit Stands - Phase 2
Status : Completed
Image : Images     Images
BeforeAfter
Development of Smart Bus Shelter - Phase 1 (5 locations)
Status : Completed
Image : Images     Images
BeforeAfter
Digital Nerve Centre - Civil Part
Status : Completed
Image : Images     Images
BeforeAfter
Smart Road Package-3A (Ashoka Road and DC Road)
Status : Completed
Image : Images     Images
BeforeAfter
Affordable Housing at Mariyamma Nagar
Status : Completed
Image : Images     Images
BeforeAfter
Solar Paneling of Glass House
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - Adarsh Nagar - Ward No:20
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - Kuvempu Nagar - Ward No:21
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - SS Puram - Ward No:25)
Status : Completed
Image : Images     Images
BeforeAfter
Construction of Boundary Wall and chain link Fencing with MS gate and provision for cameras & Lighting around Amanikere Lake.
Status : Completed
Image : Images     Images
BeforeAfter
Solid Waste Management (IEC)
Status : Completed
Image : Images     Images
BeforeAfter
Supply and installation of Smart Poles at different places in Tumakuru
Status : Completed
Image : Images     Images
BeforeAfter
Science Theme Park at Amanikere Lake
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - Amarajyothi Nagar
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - Mahalakshmi Layout
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - Sapthagiri Extension
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - Jayanagar
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - Gokul Extension
Status : Completed
Image : Images     Images
BeforeAfter
Development of Auto Stands Phase 3
Status : Completed
Image : Images     Images
BeforeAfter
Constrcution of 107 PIS boards at bus stands in tumkur
Status : Completed
Image : Images     Images
BeforeAfter
Development of Smart Bus Shelter - Phase 1 (5 locations)
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks- Siddarameshwa Extension park
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks - Island [02] tree planation at Amanikere
Status : Completed
Image : Images     Images
BeforeAfter
Development of parking at 7 conservancies at SS Puram roads in Tumakuru
Status : Completed
Image : Images     Images
BeforeAfter
Procurement of IT Hardware to Tumakuru City Corporation (TCC) for E- Office
Status : Completed
Image : Images     Images
BeforeAfter
Gym equipments procurement for SFC ate Govt PU
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks- Maruti Nagar park
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks- IB PWD park
Status : Completed
Image : Images     Images
BeforeAfter
Apportionment towards GIS Software with KUIDFC
Status : Completed
Image : Images     Images
BeforeAfter
Development of Parks- Septhagiri Nagar park
Status : Completed
Image : Images     Images
BeforeAfter
Furniture for additional classroom to Govt. PU College
Status : Completed
Image : Images     Images
BeforeAfter
Repair work of private bus stands(ward no 14) at Tumakuru.
Status : Completed
Image : Images     Images
BeforeAfter
Procurement of medical and other equipment's for RT-PCR lab at district hospital for COVID-19TESTING.
Status : Completed
Image : Images     Images
BeforeAfter
replacement of the street lights into LED street lights in the solid waste management unit at Ajjgondanahalli, Tumakuru.
Status : Completed
Image : Images     Images
BeforeAfter
Installation of nos of borewells and pumps in the solid waste management unit at Ajjagondanahalli,Tumakuru.
Status : Completed
Image : Images     Images
BeforeAfter
purchase of ALS Ambulance to new Trauma center.
Status : Completed
Image : Images     Images
BeforeAfter
supply of tractor mounted boom sprayer with boom and accessories besides mist blower to TCC at Tumakuru.
Status : Completed
Image : Images     Images
BeforeAfter
supply,installation and erection of sixty five meter high mast flag pole at amanikere.
Status : Completed
Image : Images     Images
BeforeAfter
Construction of additional classroom - New buidling at Govt. PU college
Status : Completed
Image : Images     Images
BeforeAfter
Procurement and Installation of 5 no of outdoor Gym equipment & childern play equipments at different locations in Tumakuru
Status : Completed
Image : Images     Images
BeforeAfter
Construction of Sports Complex at MG Stadium
Status : Ongoing
Image : Images     Images
BeforeCurrent
package-4,development of GSB park in ward no eleven gangasandra.and development of park in ward no 27 .batwadi sy no 45 bar 2.gangotri nagar main road.near bakery,tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
package-5 development of park in municipal layout sy no 60 bar 1 (ward no 25) and banjara bhavana in saraswathipuram 2nd stage (ward no 28) tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
infrastructure correction in the existing lighting system in tumakuru
Status : Ongoing
Image : Images     Images
BeforeCurrent
supply and installation of lake amenities along with allied works at amanikere tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
storm water drains.
Status : Ongoing
Image : Images     Images
BeforeCurrent
Barbed wire fencing on existing compound wall in solid waste management unit at ajjgondanahalli,Tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
construction of macadam around the inner compound wall in solid waste management unit at ajjgondanahalli,tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
construction of anganwadi centers in Tumakuru city corporation limits,Tumakuru (phase 1)
Status : Ongoing
Image : Images     Images
BeforeCurrent
development of madhuvana park.Shivakumara swamiji park and Deverayanapatna park in Tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
providing printing,framing,installation of way finding signage "you are here" signage board in Tumakuru
Status : Ongoing
Image : Images     Images
BeforeCurrent
creation of lighting infrastructure on the identified dark spot in thirty five wards coming under TCC jurisdiction in tumakuru city.
Status : Ongoing
Image : Images     Images
BeforeCurrent
repair works of anganwadi centrers in tumakuru city corporation limits,tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
installation of CCTV in solid waste management unit at ajjgondanahalli,tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
construction of the administrative office at solid waste management unit at ajjgondanahalli ,Tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
Amanikere Urban Hath
Status : Ongoing
Image : Images     Images
BeforeCurrent
Development of Sports Arena at PU College
Status : Ongoing
Image : Images     Images
BeforeCurrent
PPP-Street-lighting control system
Status : Ongoing
Image : Images     Images
BeforeCurrent
PPP-Piped Natural Gas Supply
Status : Ongoing
Image : Images     Images
BeforeCurrent
package eight-development of nethaji park ward no twenty one and other parks in tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
development works at vidyanagar pump house
Status : Ongoing
Image : Images     Images
BeforeCurrent
shifting of BESCOM HT line and other infrastructure in CSD-1.
Status : Ongoing
Image : Images     Images
BeforeCurrent
development of street vending zones at kothithopu road near ss circle,tumakuru phase 1
Status : Ongoing
Image : Images     Images
BeforeCurrent
construction of bus shelters at 15 locations in tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
development of ss circle (ward no 19 )tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
procurement and installation of furniture for pu college including additional classroom tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
package - selection of the system integrator for installation,commissioning and operation of smart infrastructure at selected parks in tumakuru- IT components.
Status : Ongoing
Image : Images     Images
BeforeCurrent
providing ,installation and commissioning of garden lights poles along the bunds of amanikere,tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
filling of Hemavathi water from Gangasandra tank to maralur tank
Status : Ongoing
Image : Images     Images
BeforeCurrent
development of model centers at Dibbur and other locations in Tumakuru -phase two
Status : Ongoing
Image : Images     Images
BeforeCurrent
junction improvement to DC office circle in tumakuru.
Status : Ongoing
Image : Images     Images
BeforeCurrent
development of park near panchamukhi extension antharsanahalli bypass(ward number two) and development of azad nagar park in Ashoka nagar (ward no twenty six)
Status : Ongoing
Image : Images     Images
BeforeCurrent
Water Supply System - 247 Water Supply
Status : Ongoing
Image : Images     Images
BeforeCurrent
Convergence: Ring road - shifting of utilities
Status : Ongoing
Image : Images     Images
BeforeCurrent
Development of Kumtaiah Park in IDSMT layout & Unni Krishnan Park in Sadashiva Nagar
Status : Ongoing
Image : Images     Images
BeforeCurrent
Development of parks at Batavadi (ward no 27), Pragathi Badavane & Yadava nagar ward no 29 in Tumkauru
Status : Ongoing
Image : Images     Images
BeforeCurrent
ICMCC Phase 2
Status : Ongoing
Image : Images     Images
BeforeCurrent
Construction of Building for ICMCC
Status : Ongoing
Image : Images     Images
BeforeCurrent
Construction of Compound wall in PU College
Status : Ongoing
Image : Images     Images
BeforeCurrent
Construction additional classrooms on existing old building
Status : Ongoing
Image : Images     Images
BeforeCurrent
Repair work required for 8 no's of buildings at Primary Health Centre
Status : Ongoing
Image : Images     Images
BeforeCurrent
Development of Park - Nrupathunga Extension
Status : Ongoing
Image : Images     Images
BeforeCurrent
Construction of Tunnel walking and Yoga retreat in Amanikere
Status : Ongoing
Image : Images     Images
BeforeCurrent
Redevelopment of Bus Shelters at different locations in Tumakuru
Status : Ongoing
Image : Images     Images
BeforeCurrent
CC Road Entrance Gate at PU College
Status : Ongoing
Image : Images     Images
BeforeCurrent
Construction of Toilet block at Govt. PU College Premises
Status : Ongoing
Image : Images     Images
BeforeCurrent
Development of Two wheeler parking at FMC Road conservancy -On Street Parking Lots
Status : Ongoing
Image : Images     Images
BeforeCurrent
Integrated Bus Terminal Redevelopment
Status : Ongoing
Image : Images     Images
BeforeCurrent
Skill on wheels
Status : Ongoing
Image : Images     Images
BeforeCurrent
Trauma Centre
Status : Ongoing
Image : Images     Images
BeforeCurrent
Development of Park - Sapthagiri park
Status : Ongoing
Image : Images     Images
BeforeCurrent
Redevelopment of Ring Road - Phase 2
Status : Ongoing
Image : Images     Images
BeforeCurrent
Drone Survey
Status : Ongoing
Image : Images     Images
BeforeCurrent
City Library
Status : Ongoing
Image : Images     Images
BeforeCurrent
Business Incubation & Innovation Centres
Status : Ongoing
Image : Images     Images
BeforeCurrent
Lake Bank Conservation & Erosion Protection (Amanikere Lake)
Status : Ongoing
Image : Images     Images
BeforeCurrent
Intervention and Additional improvement for 24*7 Water Supply (SCADA system (KUWS&DB)) - Filling of Hemavathi water to Amanikere
Status : Ongoing
Image : Images     Images
BeforeCurrent
Public Toilets - Phase 2
Status : Ongoing
Image : Images     Images
BeforeCurrent
Utilization of Impounded Water in Tumakuru Amanikere by Pumping Water to the Existing 50MLD Capacity WTP in P.N.Palya
Status : Ongoing
Image : Images     Images
BeforeCurrent
Development of Park - Sajeevini park
Status : Ongoing
Image : Images     Images
BeforeCurrent
Energy Efficient Lighting (LED lighting for New extensions)
Status : Ongoing
Image : Images     Images
BeforeCurrent
Smart Road Package-3B (chammundawasheri,Dr. Radha Krishana , Belgumba Road)
Status : Ongoing
Image : Images     Images
BeforeCurrent
Smart Road Package-3C - ( BH Road)
Status : Ongoing
Image : Images     Images
BeforeCurrent
MSI (Centralised Data Center at KMDS)
Status : Ongoing
Image : Images     Images
BeforeCurrent
Shoulder Improvement for Other than Smart Roads
Status : Ongoing
Image : Images     Images
BeforeCurrent
Road Improvements in ABD area with Under Ground Ducting and Resurfacing
Status : Ongoing
Image : Images     Images
BeforeCurrent
Smart Road Package-2 (6 roads - Mandipet Main Road, Mandipet 1st and 2nd Main Road, North Bus Stand Road(Gubbi Veeranna Kalamandir Road), South Bus Stand Road(KSRTC Depot Road), Bhagavan Mahaveer Jain Road, FMG Cariappa road)
Status : Ongoing
Image : Images     Images
BeforeCurrent
Development of Fitness Theme Park at Kasaba
Status : Ongoing
Image : Images     Images
BeforeCurrent
Smart Road Package-1 (4 Roads - MG, JC, Horpet and Vivekananda roads.
Status : Ongoing
Image : Images     Images
BeforeCurrent
Furniture part +IT part+Electrical Work
Status : Ongoing
Image : Images     Images
BeforeCurrent
Construction of Multi-Dimensional Auditorium with Library and Class Rooms at Empress Govt. High School/PU College
Status : Ongoing
Image : Images     Images
BeforeCurrent
Rain Water Harvesting & Afforestation
Status : Ongoing
Image : Images     Images
BeforeCurrent
solid waste management-remediation of open dump and cycling of space at ajjagondanahalli dumping site bio mining.
Status : Tendered
Image : Images     Images
BeforeCurrent
solid waste management-construction of landfill at ajjagondanahalli dumping site.
Status : Tendered
Image : Images     Images
BeforeCurrent
development of street vending zones at kothithopu road near ss circle,tumakuru phase-2
Status : Tendered
Image : Images     Images
BeforeCurrent
junction improvement at kanaka circle in tumakuru
Status : Tendered
Image : Images     Images
BeforeCurrent
construction of vending zones at mariyamma nagar,tumakuru
Status : Tendered
Image : Images     Images
BeforeCurrent
construction of vending zones at jayanagar bus stop,shettihalli tumakuru.
Status : Tendered
Image : Images     Images
BeforeCurrent
supply of uniforms for tumakuru city corporation pourakarmikas.
Status : Tendered
Image : Images     Images
BeforeCurrent
construction of vending zones at dhobi ghat,ashoknagar tumakuru.
Status : Tendered
Image : Images     Images
BeforeCurrent
package six -development of park in bharathi nagar(ward no twenty two ) and sanjeevini nagar .kyathasandra(ward no thirty three ).tumakuru.
Status : Tendered
Image : Images     Images
BeforeCurrent